PT Supreme Energy Rantau Dedap (SERD) conducted the First Spud-in Exploration Drilling RD-B1 Geothermal Working Area Rantau Dedap on last February 3rd 2014 located at Muara Enim Regency, Lahat Regency and Pagar Alam City, South Sumatra Province. Well Drilling RD-B1 is a series of 5-7 drilling exploration wells in the Geothermal Working Area, to prove the existence of geothermal resources, is sufficient to build a geothermal power plant with the capacity of 220 MW. Period for this exploration drilling will be ranged between 6 to 12 months.
This ceremony was attended by the Regent of Muara Eni...